Completed: June 2019
The Rakowski Recycling plant scope included a new 600 volt 3 Phase electrical service to the building. Robin Electric supplied and installed the electrical distribution throughout the building, high bay lighting and equipment controls.
Completed: June 2019
The Hazelridge sports complex mechanical room addition and renovation, located on Memorial Blvd in Hazelridge MB, involved a new addition which included installation of a transformer, distribution panel, heating and LED lighting along with energy saving occupancy sensors.
Completed: September 2019
Our electrical scope of work involved the installation of electrical controls for the new waste water treatment equipment, lighting and electrical distribution. A building addition was constructed to house a wastewater treatment plant intended to filter food waste. Robin Electric also provided an extension and upgrade to the customer's existing fire alarm.
Client: Fort Group Chartered Professional Accountants
Completed: May 2019
Our Scope of work on the base building, located on Henderson Highway, included a new electrical service, common area and exterior lighting, as well as electrical distribution equipment throughout the building.
Client: City of Winnipeg
Completed: October 2017
Robin Electric as general contractor on this project removed six existing lights and replaced them with eight energy conscious LED lamp standards and timers, allowing for increased lighting at the hockey rink while keeping energy costs low.
Completed: August 2017
Robin electric was proud to supply and install all of the electrical components for the new Dugald Daycare located on Holland St in the town of Dugald, MB. Our scope included installation of the distribution equipment, smart night lighting for the parking lot and building, emergency generator, addressable fire alarm system with fire water pump, as well as electric heat, data cabling and access control.
Completed: August 2017
The Canadian Grain Commission Interior Renovation Re-stacking Project consisted of selective demolition, new construction, electrical work to the 6th and 7th floor and demo and new fixture installations, minor mechanical, and electrical work to accommodate new layouts to the 8th floor.
Completed: May 2017
Power-Smart upgrade
Our scope of work at the Titan Foundry building, located on Fife Street in Winnipeg included the replacement of existing interior lighting with Power Smart LED's including 23 LED low bay fixtures and 30 standard 8' LED fixtures.