Completed: May 2022
Client: Canadian Pacific Railway
In June 2020 Robin Electric began work as a proud member of the construction team at the North Transcona Yard on the new construction of a larger, modern welding facility.
Completed: April 2018
Client: Manitoba Hydro
Construction of new Heated Critical Spares Storage Building and Maintenance Building. Our scope included ground grid installation, bonding of building structural components, installation and wiring of electrical distribution equipment, lighting, fire alarm systems for both buildings, as well as commissioning and training services.
Completed: April 2017
Client: The City of Winnipeg
New industrial construction of a complete and operating wastewater pumping station. Our scope included the supply and installation of a 130 Kw natural gas standby emergency backup generator and transfer switch for the City of Winnipeg Lift Station including electrical and control work. In addition, installation of emergency lighting, switch-gear and service equipment.
Completed: June 2016
Client: Lower Fort Gary National Historic Site
Our scope of work for this project included the installation of a new 600V electrical service and modification of existing service equipment such that existing buildings would be supplied by the new 600V service. We also supplied and installed electrical distribution equipment for the new Wastewater Treatment Plant and the expanded Water Treatment Plant, as well as new lighting and instrumentation, a 200kW emergency back up generator and fire pump. Commissioning and Training services were also provided.
Completed: May 2020
Client: City of Winnipeg Water and Waste Department
Robin Electric was responsible for the supply and installation of electrical distribution equipment, new motor control center, and instrumentation including temperature sensor tags, door contact tags, and pressure indicator tags. Our scope also included a panelboard, lighting, receptacles, and emergency lighting.
Completed: September 2019
Client: City of Winnipeg Water and Waste Department
Industrial Projects: Our scope of work included the supply and installation of an RTU panel, lighting, disconnect switches and power for electric heat, and the distribution equipment.