Robin ELECTRIC CO. LTD.

Robin ELECTRIC CO. LTD.Robin ELECTRIC CO. LTD.Robin ELECTRIC CO. LTD.

(204) 224-1605

  • Home
  • About Us
  • Projects
    • Commercial
    • Industrial
    • Institutional
  • Project Showcase
    • Commercial
    • Industrial
    • Institutional
  • Our Services
    • Hydro "Power Smart"
    • Dimplex Repairs
    • Service & Maintenance
    • Lighting
    • Other Services we Offer
  • COR Safety
  • Career Opportunities
  • Contact Us
  • Clients
  • Community
  • More
    • Home
    • About Us
    • Projects
      • Commercial
      • Industrial
      • Institutional
    • Project Showcase
      • Commercial
      • Industrial
      • Institutional
    • Our Services
      • Hydro "Power Smart"
      • Dimplex Repairs
      • Service & Maintenance
      • Lighting
      • Other Services we Offer
    • COR Safety
    • Career Opportunities
    • Contact Us
    • Clients
    • Community

Robin ELECTRIC CO. LTD.

Robin ELECTRIC CO. LTD.Robin ELECTRIC CO. LTD.Robin ELECTRIC CO. LTD.

(204) 224-1605

  • Home
  • About Us
  • Projects
  • Project Showcase
  • Our Services
  • COR Safety
  • Career Opportunities
  • Contact Us
  • Clients
  • Community

Industrial projects

Canadian Pacific Rail Weld Facility

Completed: May 2022

Client: Canadian Pacific Railway


In June 2020 Robin Electric began work as a proud member of the construction team at the North Transcona Yard on the new construction of a larger, modern welding facility. 

Bi-pole III Riel Converter Station

Completed: April 2018

Client: Manitoba Hydro


Construction of new Heated Critical Spares Storage Building and Maintenance Building. Our scope included ground grid installation, bonding of building structural components, installation and wiring of electrical distribution equipment, lighting, fire alarm systems for both buildings, as well as commissioning and training services.

St Boniface Industrial Park Wastewater Pumping Station

Completed: April 2017

Client: The City of Winnipeg


New construction of a complete and operating wastewater pumping station. Our scope included the supply and installation of a 130 Kw natural gas standby emergency backup generator and transfer switch for the City of Winnipeg Lift Station including electrical and control work. In addition,  installation of emergency lighting, switch-gear and service equipment.

Lower Fort Gary National Historic Site

Completed: June 2016

Client: Lower Fort Gary National Historic Site


Our scope of work for this project included the installation of a new 600V electrical service and modification of existing service equipment such that existing buildings would be supplied by the new 600V service. We also supplied and installed electrical distribution equipment for the new Wastewater Treatment Plant and the expanded Water Treatment Plant, as well as new lighting and instrumentation, a 200kW emergency back up generator and fire pump. Commissioning and Training services were also provided.

Jessie Wastewater Pumping Station Upgrades

Completed: May 2020

Client: City of Winnipeg Water and Waste Department

 

Robin Electric was responsible for the supply and installation of electrical distribution equipment, new motor control center, and instrumentation including temperature sensor tags, door contact tags, and pressure indicator tags. Our scope also included a panelboard, lighting, receptacles, and emergency lighting.

Hawthorne Flood Pumping Station Upgrades

Completed: September 2019

Client: City of Winnipeg Water and Waste Department


Our scope of work included the supply and installation of an RTU panel, lighting, disconnect switches and power for electric heat, and the distribution equipment.